How long does it take to set up a padel court?


Panoramic padel court in the US
Panoramic padel court


The installation time of a padel court can vary depending on various factors, but we can have approximate times based on our experience.


Preparation and Leveling of the Ground and Construction of the Concrete Base: The construction of the concrete base is an essential part of the process. It can take approximately 1-2 weeks, depending on the complexity and the weather.


Delivery / Shipping: Depending on the area of the world in which the assembly is located. In the United States we have a warehouse with stock on the east coast, which greatly reduces the time and is usually a week to ten days if the model is in stock. If not, 21 days from the placing of the order.


Assembly: our team of assemblers, based on their experience, assembles a track in two and a half days.


In summary, the total installation time for a paddle tennis court could range from 4 to 6 weeks, or even more, depending on the factors mentioned. It is important to note that these are general estimates and the actual time may vary depending on the specific circumstances of each project.


If you want to start your padel project or set up your court, we can accompany you from the beginning to the first game. Send us an email to hola@businessinpadel.com and we will contact you.